Patterson-Kelley DVSCM-02 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para não Patterson-Kelley DVSCM-02. Patterson-Kelley DVSCM-02 User's Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 26
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
SEALED
COMBUSTION
DIRECT VENT/
Patterson-Kelley
P.O. Box 458, 100 Burson Street
East Stroudsburg, PA 18301
Telephone: (570) 421-7500, Facsimile: (570) 476-7247
PATTERSON-KELLEY
THERMIFIC
®
DIRECT VENT/SEALED COMBUSTION
GAS-FIRED BOILER
Supplement to the standard Installation and
Owner's Manual (TBIG - Latest Edition)
Installation Date:
_______________________
100 Burson Street, P.O. Box 458,
East Stroudsburg, PA 18301
Telephone: (877) 728-5351, Facsimile: (570) 476-7247
www.pkboilers.com
C.S.A Design-Certified
Complies with ANSI Z21.13/CSA 4.9
Gas-Fired Low Pressure Steam and Hot Water Boilers
ASME Code, Section IV
Certified by Patterson-Kelley
C.S.A Design-Certified
Complies with ANSI Z21.13/CSA 4.9
Gas-Fired Low Pressure Steam and Hot Water Boilers
DVSCM-02
Vista de página 0
1 2 3 4 5 6 ... 25 26

Resumo do Conteúdo

Página 1 - PATTERSON-KELLEY

DIRECT VENT/SEALEDCOMBUSTIONDIRECT VENT/SEALEDCOMBUSTIONDIRECT VENT/SEALEDCOMBUSTIONDIRECT VENT/SEALEDCOMBUSTIONDIRECT VENT/SEALEDCOMBUSTIONDIRECT VEN

Página 2 - Improper use may

Thermific® Gas-Fired Boiler InstallationPage 8If the air inlet and/or exhaust vent terminal are throughthe sidewall, clearances from other exhaust/

Página 3 - 1.0 INTRODUCTION

Thermific® Gas-Fired Boiler Installation/OperationPage 93.4.3.2 Series 1500, 1700, 2000Air InletExhaustVentRoundDamper90 ElbowoTransition Duct27&

Página 4 - 2.0 SAFETY

Thermific® Gas-Fired Boiler Operation/MaintenancePage 10When the chart is completed, set up your boiler'scombustion to the corresponding infor

Página 5 - 3.0 INSTALLATION

Thermific® Gas-Fired Boiler Wiring DiagramsPage 116.0 WIRING DIAGRAMS6.1 ON-OFF SERIES700, 1000, 1200Wiring Diagram

Página 6

Thermific® Gas-Fired Boiler Wiring DiagramsPage 126.1 ON-OFF SERIES700, 1000, 1200Logic Diagram

Página 7

Thermific® Gas-Fired Boiler Wiring DiagramsPage 136.1AON-OFFIRI SERIES700, 1000, 1200Wiring Diagram

Página 8

Thermific® Gas-Fired Boiler Wiring DiagramsPage 146.1AON-OFFIRI SERIES700, 1000, 1200Logic Diagram

Página 9

Thermific® Gas-Fired Boiler Wiring DiagramsPage 156.1BLO-HILOWiring Diagram

Página 10 - 90 Elbow

Thermific® Gas-Fired Boiler Wiring DiagramsPage 166.1BLO-HILOLogic Diagram

Página 11 - 4.0 OPERATION

Thermific® Gas-Fired Boiler Wiring DiagramsPage 176.1CLO-HI-LOIRIWiring Diagram

Página 12 - 5.0 MAINTENANCE

Thermific® Gas-Fired Boiler Table of Contents1.0 INTRODUCTION...11.1 Code Compliance...11

Página 13 - 6.0 WIRING DIAGRAMS

Thermific® Gas-Fired Boiler Wiring DiagramsPage 186.1CLO-HI-LOIRILogic Diagram

Página 14 - 700, 1000, 1200

Thermific® Gas-Fired Boiler Wiring DiagramsPage 196.1DON-OFF SERIES1500, 1700, 2000Wiring Diagram

Página 15

Thermific® Gas-Fired Boiler Wiring DiagramsPage 206.1DON-OFF SERIES1500, 1700, 2000Logic Diagram

Página 16

Thermific® Gas-Fired Boiler Wiring DiagramsPage 216.1EON-OFFIRI SERIES1500, 1700, 2000Wiring Diagram

Página 17 - Thermific

Thermific® Gas-Fired Boiler Wiring DiagramsPage 226.1EON-OFFIRI SERIES1500, 1700, 2000Logic Diagram

Página 18 - Logic Diagram

Thermific® Gas-Fired Boiler Wiring DiagramsPage 236.2 AUXILIARYCONTROL PANEL6.2.1 On-Off Auxiliary Control Panel

Página 20 - Page 18

Thermific® Gas-Fired Boiler IntroductionPage 11.0 INTRODUCTIONDirect vent (ANSI Z21.13) is a closed system methodof ducting the combustion air direc

Página 21 - 1500, 1700, 2000

Thermific® Gas-Fired Boiler Introduction/SafetyPage 2ExhaustVentAir InletSidewall2. Both the combustion air inlet and flue gas exhaustthrough the s

Página 22

Thermific® Gas-Fired Boiler InstallationPage 3Do not manifold two (2) or more units into a commonsidewall vent system without provisions for additi

Página 23

Thermific® Gas-Fired Boiler InstallationPage 4Whichever material is used, the termination must pointdown and must be backed by a metal plate secure

Página 24

Thermific® Gas-Fired Boiler InstallationPage 5with the application of heat. Refer to themanufacturer's instructions. Wrap the joint withalum

Página 25 - Page 23

Thermific® Gas-Fired Boiler InstallationPage 63.3.3 Exhaust Vent Connection at the Boiler6' Min. Pitch toward boiler 1/4" per foot min.

Página 26

Thermific® Gas-Fired Boiler InstallationPage 7Whichever termination is chosen, it must be doublewall vent certified under UL 1738, or ULC-636.When

Comentários a estes Manuais

Sem comentários